COMPLETED PROTECTS

SIP-Station Building (Filtration Unit)

The separate three-storey building with a total volume of 4.000 m3consisting of the production floor and office rooms, stairs, air-ventilation room, switchboard rooms, workshops, etc. Complex design and construction are performed ( the foundation, the domestic and industrial sewerage are built of stainless chemically resistant steel, water supply system, heating with the use of aluminum heating radiators, outdoor walls of «PAROK» panels, reinforced concrete monolithic floors, roof).

Location
: Tula, Russia

Client
: Baltika Beer

Contract Duration
: 2001-2003